Skip to main content
Home
Log in
Home

Main navigation

  • Manual
    • Volume 1: University Administration
    • Volume 2: Planning
      • Introduction and Summary
    • Volume 3: Design, Design Documents, Instruction, Models
    • Volume 4: Construction Contracting
    • Volume 5: Bidding and Construction Administration
    • Volume 6: Plant Operations and Maintenance
  • Glossary
  • Templates
    • Design Contract Templates
      • 1. Balcony Bill PSA
      • 2. Construction Management Agreement
      • 3. Executive Design Professional Agreement (EDPA)
      • 4. EDPA Blanket Agreement
      • 5. EDPA for CM at Risk Delivery
      • 6. EDPA Lite with Any Delivery Method
      • 7. Master Architect Agreement for Design-Build Delivery
      • 8. Professional Services Agreement
    • Construction Contract Templates
      • 1. 179D/Inflation Reduction Act (IRA) Funding
      • 2. Best Value Contractor Selection
      • 3. Brief Design Build Contract Templates
      • 4. Brief Form Contract Templates
      • 5. CM at Risk Contract Templates
      • 6. Design Build Contract Templates
      • 7. Energy Savings Brief Design Build Contract Templates
      • 8. Informal Form Contract Templates
      • 9. Job Order Contracting (JOC) Contract Templates
      • 10. Long Form Contract Templates
      • 11. Mini Form Contract Templates
      • 12. Multiple Prime Contract Templates
      • 13. Prequalification
      • 14. Progressive Design Build Contract Templates
      • 15. Insurance and University Controlled Insurance Program (UCIP)
  • Resources
Log in

Construction Contract Templates

Image credit: UC Santa Cruz Rachel Carson College

Breadcrumb

  1. Home
  2. Construction Contract Templates
  3. 14. Progressive Design Build Contract Templates
  4. 14.1 Pre-Award/Procurement
  5. 14.1.6 Interview Scoring

Breadcrumb

  1. Home
  2. Construction Contract Templates
  3. 14. Progressive Design Build Contract Templates
  4. 14.1 Pre-Award/Procurement
  5. 14.1.6 Interview Scoring

14.1.6 Interview Scoring

UCOP Facilities Manual

  • Manual
  • Design Contract Templates
  • Construction Contract Templates
  • Resources
  • Glossary
  • Help

Frequently Used Facilities Manual Links

  • Capital Programs
  • Capital Programs Institute
  • Capital Planning
  • Consolidated Capital Report
  • Capital Programs, Energy and Sustainability
  • Design and Construction Services
  • Facilities and Asset Management
  • Low Carbon Showcase
  • Small Business, Big Outcomes Program
  • UC Office of the President

Copyright © Regents of the University of California | University of California

  • Contacts
  • Accessibility
  • Privacy Statement
  • Terms of Use

Main navigation

  • Manual
    • Volume 1: University Administration
      • Chapter 1: Introduction to the Facilities Manual
        • 1.1 Facilities Manual Organization 
        • 1.2 Facilities Manual Content, Style, and Language 
          • 1.2.1 Content Levels
          • 1.2.2 Citation 
          • 1.2.3 References 
          • 1.2.4 Approved Documents
          • 1.2.5 Language
        • 1.3 Facilities Manual Revision, Maintenance, and Reproduction 
          • 1.3.1 Distribution
          • 1.3.2 Updates 
      • Chapter 2: Facilities Manual Executive Summary
      • Chapter 3: University Governance and Organization
        • 3.1 University Governance 
          • 3.1.1 The Regents
          • 3.1.2 The President
        • 3.2 University Facilities 
          • 3.2.1 Campuses
          • 3.2.2 Government Laboratory
          • 3.2.3 Division of Agriculture and Natural Resources
          • 3.2.4 Other Administrative Units
          • 3.2.5 Affiliated Units
        • 3.3 Preparation of Regents’ Materials 
      • Chapter 4: Delegations and Limitations of Authority
        • 4.1 Basic Authority
        • 4.2 Delegated Authority 
        • 4.3 Delegations of Authority Table 
      • Chapter 5: University Policies
        • 5.1 Text of Referenced Policies
      • Chapter 6: State Laws
        • 6.1 State Laws Applicable to University Construction Contracting 
      • Chapter 7: Project Quality Management Program
        • 7.1 Program Goals 
          • 7.1.1 Project Team Members
        • 7.2 Program Scope 
        • 7.3 Program Requirements and Procedures 
        • 7.4 Teamwork 
          • 7.4.1 Partnering
        • 7.5 Program Resources 
        • 7.6 Evaluation by the Project Team 
    • Volume 2: Planning
      • Introduction and Summary
      • Chapter 1: Academic and Strategic Planning
        • 1.1 Academic and Strategic Planning 
          • 1.1.1 Five-Year Planning Perspectives 
          • 1.1.2 Design and Planning Issues
      • Chapter 2: Long Range Development Plans
        • 2.1 LRDP
          • 2.1.1 LRDP Organization
          • 2.1.2 LRDP Elements
          • 2.1.3 Environmental Impact Report
          • 2.1.4 LRDP Approval and Amendment Process
      • Chapter 3: Physical Design Framework (PhDF)
        • 3.1 PhDF
          • 3.1.1 Typical Elements of a PHDF
          • 3.1.2 PhDF Approval and Amendment Process
      • Chapter 4: Capital Financial Plan
        • 4.1 CFP
          • 4.1.1 Typical Elements of a CFP
          • 4.1.2 CFP Approval and Amendment Process
      • Chapter 5: Environmental Issues and CEQA Compliance
        • 5.1 California Environmental Quality Act (CEQA) Compliance 
        • 5.2 Environmental Impact Classification Form 
        • 5.3 Environmental Health and Safety Liaison 
        • 5.4 Fire Marshal and Fire and Life Safety Issues 
      • Chapter 6: Pre-Design Phase
        • 6.1 Pre-Design
        • 6.2 Site Analysis
          • 6.2.1 Geotechnical Reports
          • 6.2.2 Hydrology Studies
          • 6.2.3 Land Surveys
        • 6.3 Existing Building Analysis
        • 6.4 Surveys of Existing Hazardous Materials (Due Diligence) 
        • 6.5 Data Compilation
          • 6.5.1 Site Analysis Report
          • 6.5.2 Site Analysis Drawings
          • 6.5.3 Comparative Site Analysis
        • 6.6 Programming
          • 6.6.1 Programming Objectives
          • 6.6.2 The Project Program
        • 6.7 Construction Costs
          • 6.7.1 Sources of Cost Information
          • 6.7.2 Methods of Estimating Costs
          • 6.7.3 Contingencies
          • 6.7.4 Preparing the Construction Cost Estimate
          • 6.7.5 Cost Indexing
          • 6.7.6 Donation Guidelines
      • Chapter 7: Capital Planning & Real Estate Approvals
        • 7.1 Capital Project Budget Approvals 
        • 7.2 Capital Project Design Approvals 
        • 7.3 Capital Project Budget Augmentations and Scope Changes 
          •  7.3.1 Authority and Transaction Requirements
          • 7.3.2 Scope Changes and Implementing Work Changes
        • 7.4 Guidelines for Minor Amendments to PhDF 
          • 7.4.1 Amendments
          • 7.4.2 Process for Approval of Changes
          • 7.4.3 PhDFs are not "Projects" as Defined by CEQA
        • 7.5 Certification Checklist Directions 
          • 7.5.1 Certification Checklist Eligibility
          • 7.5.2 Submittal Requirements
          • 7.5.3 Process
          • 7.5.4 General Order of Actions for the Delegated Process
        • 7.6 Reporting for Capital Projects 
          • 7.6.1 Requirements
        • 7.7 Authorization for Acquisitions, Dispositions, or Ground Lease of Real Property 
        • 7.8 Requirements to Lease, License, and Granting Easements or Rights-of-Way Under Delegated Authority  
          • 7.8.1 Leases
          • 7.8.2 Licenses
          • 7.8.3 Easements and Rights-of-Way
          • 7.8.3 Ancillary Documents, Amendments, and Other Modifications
          • 7.8.4 Reporting Requirements
          • 7.8.5 Forms 
          • 7.8.6 Process for Legal Review
          • 7.8.7 Descriptions of Lease, License, and Easement
          • 7.8.8 Further Delegation of Authority
        • 7.9 Reimbursement Agreements and Stipend Agreements Ancillary to Real Property Transactions 
          • 7.9.1 Authority
          • 7.9.2 Description of Reimbursement and Stipend Agreements
    • Volume 3: Design, Design Documents, Instruction, Models
      • Chapter 1: Project Design Phases
        • 1.1 Predesign Phases 
          • 1.1.1 Design Professional Services
          • 1.1.2 Project Program
          • 1.1.3 Review of Conceptual Design
          • 1.1.4 Preliminary Evaluation
        • 1.2 Schematic Design 
          • 1.2.1 Environmental Documents
          • 1.2.2 Value Engineering
        • 1.3 Design Development 
          • 1.3.1 Value Engineering
          • 1.3.2 Design Development Documents and the Effective Code Date
        • 1.4 Construction Documents 
      • Chapter 2: Consultant Selection
        • 2.1 University Guidelines of Equal Opportunity in Contracting 
        • 2.2 Procedures for Consultant Selection
          • 2.2.1 Advertising
          • 2.2.2 Applicant Pool
          • 2.2.3 Screening Committee 
          • 2.2.4 Screening Process
          • 2.2.5 Selection Committee
          • 2.2.6 Selection Process
          • 2.2.7 Conflict of Interest
          • 2.2.8 Avoiding Follow-On Contracts
          • 2.2.9 Sheltered SBE/DVBE Pool For Executive Design Professionals Under $100,000
        • 2.3 Contract Negotiations and Appointments 
        • 2.4 Consultant Insurance Requirements  
        • 2.5 Agreement Execution 
        • 2.6 Project File Records 
        • 2.7 Consultant Services Not Covered by PCC 10510.4 - 10510.9
        • 2.8 Design Professional Appointment Procedures 
        • 2.9 Authority to Appoint Executive Design Professionals 
        • 2.10 Submitting a Request for an Executive Design Professional Appointment 
      • Chapter 3: Design Professional Agreements
        • 3.1 Preapproved Agreements 
        • 3.2 Modifying Pre-Approved Agreements 
        • 3.3 Cover Sheets and Instructions 
        • 3.4 General Preparation Instructions 
        • 3.5 Executive Design Professional Agreement
          • 3.5.1 Terms in the Executive Design Professional Agreement
        • 3.6 Management Agreement 
        • 3.7 Professional Services Agreement 
      • Chapter 4: Code and Regulatory Compliance
        • 4.1 Code Compliance and Administration 
          • 4.1.1 Certified Building Official (CBO)
          • 4.1.2 Designated Campus Fire Marshal (DCFM)
          • 4.1.4 Occupancy and Ancillary Documents
        • 4.2 State Codes, Regulations, and Agencies 
          • 4.2.1 Effective Code Date
          • 4.2.2 California Code of Regulations
          • 4.2.3 California Building Code
          • 4.2.4 California Energy Code
          • 4.2.5 Energy Code Updates – Solar and Storage Requirements for New Buildings
          • 4.2.6 Division of State Architect, Access Compliance
          • 4.2.7 Department of Health Care Access and Information (HCAI)
          • 4.2.8 California Coastal Commission
          • 4.2.9 Division of Industrial Safety and Health, Elevator Unit
          • 4.2.10 Department of General Services
        • 4.3 Local Jurisdictions 
          • 4.3.1 Air Quality Management Districts
          • 4.3.2 Storm Water Programs
        • 4.4 Federal Regulations 
          • 4.4.1 Americans with Disabilities Act
          • 4.4.2 Clean Air Act
          • 4.4.3 Clean Water Act
          • 4.4.4 Hazardous Waste Laws
      • Chapter 5: Design Reviews and Approval
        • 5.1 Independent Design and Cost Review 
          • 5.1.1 Independent Reviewer Selection
          • 5.1.2 Design Review Format
          • 5.1.3 Cost Review Requirements
        • 5.2 Environmental Review and Documentation 
        • 5.3 Seismic Safety and Review
          • 5.3.1 Seismic Safety Policy
          • 5.3.2 Seismic Safety Program
        • 5.4 Site Approval 
        • 5.5 Design Approval Authority 
        • 5.6 Regents’ Design Approval 
          • 5.6.1 Guidelines for Preparing and Submitting Regents' Action Items
          • 5.6.2 Environmental Documentation
          • 5.6.3 Procedures for Submitting Environmental Documents
        • 5.7 UCOP and Regents’ Presentation 
          • 5.7.1 Preparation
          • 5.7.2 UCOP Design Review Meeting
          • 5.7.3 Meeting of the Regents' Finance and Capital Strategies Committee
        • 5.8 Executive Vice President Design Approval 
          • 5.8.1 Guidelines for Preparing and Submitting Presidential Action Items
          • 5.8.2 Environmental Documentation
        • 5.9 UC Sustainability Requirements 
          • 5.9.1 Policy on Sustainable Practices
      • Chapter 6: Project Records
        • 6.1 Record Retention
          • 6.1.1 Project File Contents
    • Volume 4: Construction Contracting
      • Chapter 1: Construction Contracting
        • 1.1 Required Modes of Contracting 
          • 1.1.1 Complete Plans and Specifications Contracting Mode
          • 1.1.2 Design Build Mode
          • 1.1.3 Construction Manager Mode
          • 1.1.4 Cost-Plus-Fee Mode
          • 1.1.5 Other Contracting Modes
        • 1.2 Types of Construction Contracts 
          • 1.2.1 The Single Contract and Multiple Prime Contracts
        • 1.3 Types of Construction Documents 
          • 1.3.1 Long Form
          • 1.3.2 Brief Form
          • 1.3.3 Informal Form
          • 1.3.4 Mini Form
          • 1.3.5 Design-Build Form
          • 1.3.6 Progressive Design-Build Form
          • 1.3.7 CM at Risk Form
          • 1.3.8 Multiple Prime Form
          • 1.3.9 Job Order Contract (JOC)
          • 1.3.10 Brief Design-Build
        • 1.4 Construction Team 
          • 1.4.1 University
          • 1.4.2 Contractor
          • 1.4.3 University's Representative
          • 1.4.4 Design Professional
          • 1.4.5 Construction Manager
          • 1.4.6 Project Manager
        • 1.5 Methods of Determining, Stating, and Paying the Contract Sum 
          • 1.5.1 Lump Sum Method
          • 1.5.2 Cost-Plus-Fee Method
          • 1.5.3 Unit Prices Method
      • Chapter 2: Construction Document Organization
        • 2.1 Construction Document Format
        • 2.2 Core Documents and Non-Core Documents 
        • 2.3 Contract Documents 
      • Chapter 3: Selecting the Type of Construction Documents
        • 3.1 Estimated Contract Sum
          • 3.1.1 General Dollar Limitations
          • 3.1.2 Lowest Informal Bid Exceeds $640,000
          • 3.1.3 Federally Funded Projects
          • 3.1.4 Equipment Purchase and Installation
        • 3.2 Contractor Selection 
      • Chapter 4: Preparing Individual Construction Documents
        • 4.1 Cover Sheets and Instructions
        • 4.2 General Preparation Instructions 
          • 4.2.1 Digital Signatures and Notarization
        • 4.3 Introductory Pages 
          • 4.3.1 Cover Page
          • 4.3.2 Certification
          • 4.3.3 Table of Contents
        • 4.4 Bid Solicitation 
          • 4.4.1 Request for Bid
          • 4.4.2 Advertisement for Bids
          • 4.4.3 Project Directory
        • 4.5 Bidding Requirements
          • 4.5.1 Instructions to Bidders
          • 4.5.2 Supplementary Instructions to Bidders
          • 4.5.3 Information Available to Bidders
          • 4.5.4 Bid Form
          • 4.5.5 Bid Bond
        • 4.6 Contract Documents
          • 4.6.1 Agreement
          • 4.6.2 General Conditions
          • 4.6.3 Supplementary Conditions
          • 4.6.4 Exhibits
          • 4.6.5 Specifications
          • 4.6.6 List of Drawings
          • 4.6.7 Drawings
          • 4.6.8 Addenda
          • 4.6.9 Notice to Proceed
          • 4.6.10 Change Order
          • 4.6.11 Field Order
          • 4.6.12 Notice of Completion
      • Chapter 5: Modifying the Construction Documents
        • 5.1 Updates to the Construction Documents 
          • 5.1.1 Interim Improvements Made by Letter
        • 5.2 Document Changes Related to Contracting Mode 
          • 5.2.1 Using Complete Plans and Specifications Mode
          • 5.2.2 Modifications for the Design-and-Build Mode
          • 5.2.3 Modifications for the Construction Manager Mode
          • 5.2.4 Modifications for the Cost-Plus-Fee Mode
          • 5.2.5 Modifications for Other Contracting Modes
        • 5.3 Special Project Applications 
          • 5.3.1 Federally Funded Projects
        • 5.4 Special Project Circumstances 
          • 5.4.1 Allowances
          • 5.4.2 Alternates
          • 5.4.3 Asbestos Abatement
          • 5.4.4 Assignments
          • 5.4.5 Bidder Prequalification
          • 5.4.6 Bidder Qualification
          • 5.4.7 Code Requirements, Optional
          • 5.4.8 Early Completion Bonus
          • 5.4.9 Construction Sequence
          • 5.4.10 Contractor's Statement of Experience and Financial Condition
          • 5.4.11 Hospital Projects
          • 5.4.12 Incremental Funding of Single Lump-Sum Contracts
          • 5.4.13 Irrevocable Bid Period, Changing
          • 5.4.14 Daily Rate of Compensation for Compensable Delays
          • 5.4.15 Phased Construction and Multiple Liquidated Damages
          • 5.4.16 Separate Bids and Combined Bids
          • 5.4.17 Separate Contracts
          • 5.4.18 Soil and Subsurface Conditions
          • 5.4.19 Soils Engineer
          • 5.4.20 Specialty Contractors
          • 5.4.21 Trenching and Excavating
          • 5.4.22 Unit Prices
          • 5.4.23 University Controlled Insurance Program (UCIP)
          • 5.4.24 Use of Common Site
          • 5.4.25 Volunteer Labor
      • Chapter 6: Construction Documents Review Procedures
        • 6.1 University Reviews
          • 6.1.1 Facility Reviews
          • 6.1.2 UCOP and UCL
        • 6.2 External Reviews
          • 6.2.1 Division of the State Architect - Access Compliance
          • 6.2.2 Office of the State Fire Marshal
          • 6.2.3 Department of Health Care Access and Information (HCAI)
          • 6.2.4 Coastal Commission
          • 6.2.5 Air Quality Management Districts
          • 6.2.6 Federal Agencies
      • Chapter 7: Project Quality Management Program
        • 7.1 Program Goals
          • 7.1.1 Project Team Members
        • 7.2 Program Scope
        • 7.3 Program Requirements and Procedures 
        • 7.4 Teamwork 
          • 7.4.1 Partnering
        • 7.5 Program Resources 
        • 7.6 Evaluation by the Project Team 
    • Volume 5: Bidding and Construction Administration
      • Chapter 1: Methods of Contractor Selection
        • 1.1 Competitive Bidding
          • 1.1.1 Formal vs. Informal Competitive Bidding
          • 1.1.2 Federally Funded Projects
        • 1.2 Informal Competitive Bidding Procedures 
          • 1.2.1 Sheltered SBE/DVBE Informal and Negotiated Bidding Pool 
        • 1.3 Negotiated Contracting 
        • 1.4 Duration of the Bidding Period 
        • 1.5 Equal Opportunity Policy 
          • 1.5.1 Outreach
          • 1.5.2 Certification
          • 1.5.3 Statistical Records
        • 1.6 Best Value Contractor Selection 
          • 1.6.1 Best Value Bidder Selection Process
          • 1.6.2 Required Guidelines for Evaluation of Bidder Qualifications
          • 1.6.3 Procedures for Evaluation of Bidder Qualifications  
      • Chapter 2: Bidding Documents
        • 2.1 Bidding Document Types
        • 2.2 Bidding Document Review
      • Chapter 3: Preparing to Solicit Bids
        • 3.1 Conditions Prerequisite to Bidding 
        • 3.2 Availability of Funds 
          • 3.2.1 State-Funded Projects
          • 3.2.2 Non-State-Funded Projects
        • 3.3 Concurrent Approval by Funding Agency
          • 3.3.1 State-Funded Projects
          • 3.3.2 Lease-Revenue Bond-Funded Projects
        • 3.4 Project File Maintenance 
        • 3.5 Compliance with State and Federal Law or Regulation 
          • 3.5.1 American Recovery and Reinvestment Act of 2009 (ARRA)
          • 3.5.2 Prevailing Wage Determination Date
      • Chapter 4: Determining Bidder Responsibility
        • 4.1 Responsibility: Origin and Policy 
        • 4.2 Standard Bidding Document Requirements 
        • 4.3 Prequalification
          • 4.3.1 Prequalification Guidelines
          • 4.3.2 Contractor Prequalification Procedures
          • 4.3.3 Subcontractor Prequalification Procedures
        • 4.4 Qualification 
          • 4.4.1 Qualification Guidelines
          • 4.4.2 Qualification Procedures
        • 4.5 Disqualification
          • 4.5.1 Disqualification Guidelines
          • 4.5.2 Disqualification Procedures
      • Chapter 5: Soliciting Bids
        • 5.1 Soliciting Formal Competitive Bids 
          • 5.1.1 Advertising for Bids
          • 5.1.2 Issuing Bidding Documents
          • 5.1.3 Pre-Bid Conference
          • 5.1.4 Modification or Withdrawal of Bids Before the Bid Deadline
          • 5.1.5 Establishment of Procedure for Selection of Alternates
        • 5.2 Soliciting Informal Competitive Bids 
          • 5.2.1 Withdrawal of Bids Before the Bid Deadline
        • 5.3 Addenda 
      • Chapter 6: Receiving and Opening Bids
        • 6.1 Bid Deadline 
        • 6.2 Receiving Formal Competitive Bids 
          • 6.2.1 Bid Submittal Requirements
          • 6.2.2 Facility Procedures
          • 6.2.3 Modification or Withdrawal of Bids After the Bid Deadline
        • 6.3 Opening Formal Competitive Bids
          • 6.3.1 Facility Procedures
        • 6.4 Receiving Informal Competitive Bids 
          • 6.4.1 Bid Submittal Requirements
          • 6.4.2 Facility Procedures
          • 6.4.3 Withdrawal of Bids After the Bid Deadline
        • 6.5 Opening Informal Competitive Bids 
          • 6.5.1 Facility Procedures
      • Chapter 7: Reviewing and Evaluating Bids
        • 7.1 Responsive and Nonresponsive Bids 
          • 7.1.1 Bid Irregularities
        • 7.2 Bid Protests
        • 7.3 Evaluating Bids 
          • 7.3.1 Preparing the Bid Summary
          • 7.3.2 Alternates
          • 7.3.3 Separate Bids and Combined Bids
        • 7.4 Determining the Lowest Responsible Bidder
        • 7.5 Rejection of All Bids 
      • Chapter 8: Executing and Awarding the Contract
        • 8.1 Conditions Prerequisite to Contract Execution and Award 
        • 8.2 Concurrent Approval of Award by Funding Agency 
          • 8.2.1 State-Funded Projects
          • 8.2.2 Projects Under Department of Energy Contracts
          • 8.2.3 Federally or Non-State-Funded Projects
        • 8.3 Funding of Related Construction or Equipment 
        • 8.4 Notifying the Lowest Responsible Bidder
          • 8.4.1 Forfeiture of Bid Bond
        • 8.5 Required Bidder Submittals 
          • 8.5.1 Performance and Payment Bonds
          • 8.5.2 Certificates of Insurance
          • 8.5.3 Contractor's Statement of Experience and Financial Condition
        • 8.6 Executing the Contract 
          • 8.6.1 Corporate Seal and Attest
          • 8.6.2 Digital Signatures
        • 8.7 Awarding the Contract 
          • 8.7.1 Document Maintenance Upon Award
          • 8.7.2 Custody of Construction Documents
          • 8.7.3 Reporting the Award to UCOP
        • 8.8 Early Start of Construction 
        • 8.9 Notice to Proceed 
        • 8.10 Recording the Contract Documents 
      • Chapter 9: Bid Protests
        • 9.1 Bid Protests 
        • 9.1.1 Filing a Bid Protest
        • 9.1.2 Facility Review of the Protest
        • 9.1.3 Construction Review Board Appeal
      • Chapter 10: Contractor Substitution During the Bidding Period
        • 10.1 Substitution of Subcontractors During the Bidding Period 
          • 10.1.1 Procedures Applicable to Substitution for Clerical Error
          • 10.1.2 Consent Does Not Change the Contract
      • Chapter 11: Contract Administration
        • 11.1 Contract Administration Responsibility and Policy
          • 11.1.1 The University and the University's Representative
          • 11.1.2 Facility Responsibilities
          • 11.1.3 Keeping a Project File
          • 11.1.4 Administration of Projects Funded by Federal Grants
        • 11.2 Preconstruction Conference (Kick-Off)
        • 11.3 Submittals
          • 11.3.1 Schedules
          • 11.3.2 Shop Drawings
          • 11.3.3 Product Data and Samples
          • 11.3.4 Test Reports
          • 11.3.5 Requests for Substitution of Materials and Equipment
          • 11.3.6 Buy Clean California (BCCA) Submittal Requirements: Environmental Product Declarations (EPDs) and Product Category Rules (PCRs)
        • 11.4 Assignments
        • 11.5 Substitution of Subcontractors After Contract Award
          • 11.5.1 Authorized Grounds for Consenting to a Contractor's Request for Substitution
          • 11.5.2 Procedures for Substitution Requests on Grounds Other Than a Clerical Error
          • 11.5.3 Consent Does Not Change the Contract
          • 11.5.4 Failure to Specify a Subcontractor
          • 11.5.5 Penalty for Violating Fair Practices Act Provisions
        • 11.6 Insurance and Bonds
          • 11.6.1 Payment Bond
          • 11.6.2 Performance Bond
          • 11.6.3 Liability Insurance
          • 11.6.4 Builder's Risk Insurance and Loss Reporting
      • Chapter 12: Field Administration
        • 12.1 Field Observation 
        • 12.2 Inspection Policy and Responsibility
          • Pros and Cons of Inspection Responsibility Combinations
          • 12.2.1 Allocating Inspection Responsibility
          • 12.2.2 Basic Inspection Staff
          • 12.2.3 Geotechnical Engineering and Inspection
          • 12.2.4 Hospital Safety Standards and Inspection
        • 12.3 Testing
        • 12.4 Surveying
        • 12.5 Project Progress Meetings
        • 12.6 Responsibility for Safety
      • Chapter 13: Contract Modifications
        • 13.1 Field Orders
          • 13.1.1 Payment for Work Directed by a Field Order
        • 13.2 Change Orders 
          • 13.2.1 Cost Proposals
          • 13.2.2 Change Order Execution
          • 13.2.3 Change Orders and the Notice of Completion
          • 13.2.4 Contractor Disapproval of Change Orders
          • 13.2.5 Substantial Changes to the Work After Contract Award
          • 13.2.6 Guidelines for Substantial Change Orders
          • 13.2.7 Change Orders Changing the Scope of Work
          • 13.2.8 Change Orders for Post-Award Alternates
          • 13.2.9 Authority Needed to Negotiate and Execute Change Orders
          • 13.2.10 Project Contingency Use
        • 13.3 Modification of Contractual Conditions 
        • 13.4 Time Extensions Resulting From Delays 
          • 13.4.1 Guidelines For Granting Time Extensions Resulting from Delays
        • 13.5 Time Extensions Resulting from Factors Other Than Delays 
      • Chapter 14: Project Monitoring
        • 14.1 Monitoring the Contract Schedule 
        • 14.2 Wage Guidelines and Statutory Requirements 
          • 14.2.1 Prevailing Wage Rates and Fair Wage
          • 14.2.2 Payroll Records
          • 14.2.3 Employment of Apprentices
        • 14.3 Hospital Requirements
          • 14.3.1 HCAI Requirements
          • 14.3.2 Special Additional Hospital Requirements
        • 14.4 Risk Monitoring
      • Chapter 15: Contractor Payments
        • 15.1 Cost Breakdown
        • 15.2 Progress Payments
        • 15.3 Application for Payment
        • 15.4 Certificate for Payment
        • 15.5 Retention
          • 15.5.1 Normal Retention
          • 15.5.2 Securities In Lieu of Retention and Deposit of Retention Into Escrow
          • 15.5.3 Release of Retention
        • 15.6 Liquidated Damages
      • Chapter 16: Claims Resolution
        • 16.1 Contractor Claims
        • 16.2 Conditions for Making a Claim 
          • 16.2.1 Change Order Requests
        • 16.3 Negotiation 
          • 16.3.1 Decision on Claims
        • 16.4 Mediation
        • 16.5 Litigation
      • Chapter 17: Beneficial Occupancy and Substantial Completion
        • 17.1 Taking Beneficial Occupancy
        • 17.2 Determining Substantial Completion 
        • 17.3 Ending Builder’s Risk Insurance
        • 17.4 Reducing Liquidated Damages After Substantial Completion
      • Chapter 18: Contract Closeout
        • 18.1 As-Built and Record Documents 
        • 18.2 Operating and Maintenance Data 
        • 18.3 Guarantees 
          • 18.3.1 Special Guarantees
        • 18.4 Final Completion 
        • 18.5 Notice of Completion
        • 18.6 Final Payment and Release of Retention
        • 18.7 Stop Payment Notices
      • Chapter 19: Project Closeout
        • 19.1 Final Budget
        • 19.2 Closeout of Projects Funded by Federal Grants
        • 19.3 Correction of Defective Work 
          • 19.3.1 Patent and Latent Defects
          • 19.3.2 Reporting Defects and Deficiencies
          • 19.3.3 Personal Injury Caused by Inadequate Design or Poor Construction
          • 19.3.4 Post Construction Meeting
      • Chapter 20: Project Quality Management Program
        • 20.1 Program Goals 
          • 20.1.1 Project Team Members
        • 20.2 Program Scope 
        • 20.3 Program Requirements and Procedures
        • 20.4 Teamwork 
          • 20.4.1 Partnering
        • 20.5 Program Resources 
        • 20.6 Evaluation by the Project Team 
    • Volume 6: Plant Operations and Maintenance
      • Chapter 1: Plant Operations and Maintenance
        • 1.1 OMP Program Goals 
          • 1.1.1 Environmental Health and Safety References
          • 1.1.2 Health Care Accreditation Requirements
        • 1.2 Operation
          • 1.2.1 Services
        • 1.3 Construction
        • 1.4 Project 
        • 1.5 Infrastructure
        • 1.6 Maintenance
        • 1.7 Types of Maintenance
          • 1.7.1 Predictive or Planned Maintenance
          • 1.7.2 Preventive Maintenance
          • 1.7.3 Unplanned or Reactive Maintenance
          • 1.7.4 Emergency Maintenance
        • 1.8 Repair
        • 1.9 Emergency Repair
        • 1.10 Exceptions to Competitive Bidding
          • 1.10.1 Specialized Equipment
          • 1.10.2 Projects under $50,000
        • 1.11 Design Services
      • Chapter 2: Restoration and Renewal Program
        • 2.1 Facility Audit and Inspection Program
          • 2.1.1 Facility Inspection and Project Identification
          • 2.1.2 Prioritization
          • 2.1.3 Further Project Categorization
          • 2.1.4 Restoration or Capital Renewal Projects
          • 2.1.5 Integrated capital asset management program (ICAMP)
          • 2.1.6   Data Governance 
          • 2.1.7 Corporate Equipment, Facilities, and Assets System (EFA)
        • 2.2 Restoration and Renewal Funding Sources 
          • 2.2.1 State Funds
          • 2.2.2 Non-State Funds
        • 2.3 Restoration and Renewal Lists 
        • 2.4 Reports of Defects and Deficiencies 
          • 2.4.1 Guidelines for Reporting Defects and Deficiencies
          • 2.4.2 Preventing Building Deficiencies
      • Chapter 3: Energy and Water Conservation and Management
        • 3.1 Sustainability Conservation Standards and Guidelines 
          • 3.1.1 Operational Guidelines
        • 3.2 Alternate Fuel Provision
          • 3.2.1 Campus Contingency Planning
          • 3.2.2  Hospital Facilities Requirements
        • 3.3 Utility Regulatory Agencies 
          • 3.3.1 California Public Utilities Commission (CPUC)
          • 3.3.2 OMP Workload Categories
      • Chapter 4: Plant Administration
        • 4.1 Emergency Management Program
        • 4.2 Standardized Emergency Management System (SEMS) 
        • 4.3 Facility Mutual Assistance
        • 4.4 Post-Earthquake Response
        • 4.5 Emergency Preparedness and Evacuation Checklist
  • Glossary
  • Templates
    • Design Contract Templates
      • 1. Balcony Bill PSA
      • 2. Construction Management Agreement
      • 3. Executive Design Professional Agreement (EDPA)
      • 4. EDPA Blanket Agreement
      • 5. EDPA for CM at Risk Delivery
      • 6. EDPA Lite with Any Delivery Method
      • 7. Master Architect Agreement for Design-Build Delivery
      • 8. Professional Services Agreement
    • Construction Contract Templates
      • 1. 179D/Inflation Reduction Act (IRA) Funding
      • 2. Best Value Contractor Selection
      • 3. Brief Design Build Contract Templates
      • 4. Brief Form Contract Templates
      • 5. CM at Risk Contract Templates
      • 6. Design Build Contract Templates
      • 7. Energy Savings Brief Design Build Contract Templates
      • 8. Informal Form Contract Templates
      • 9. Job Order Contracting (JOC) Contract Templates
      • 10. Long Form Contract Templates
      • 11. Mini Form Contract Templates
      • 12. Multiple Prime Contract Templates
      • 13. Prequalification
      • 14. Progressive Design Build Contract Templates
      • 15. Insurance and University Controlled Insurance Program (UCIP)
  • Resources