Skip to main content
Home
Log in
Home

Main navigation

  • Manual
    • Volume 1: University Administration
    • Volume 2: Planning
      • Introduction and Summary
    • Volume 3: Design, Design Documents, Instruction, Models
    • Volume 4: Construction Contracting
    • Volume 5: Bidding and Construction Administration
    • Volume 6: Plant Operations and Maintenance
  • Glossary
  • Templates
    • Design Contract Templates
      • 1. Balcony Bill PSA
      • 2. Construction Management Agreement
      • 3. Executive Design Professional Agreement (EDPA)
      • 4. EDPA Blanket Agreement
      • 5. EDPA for CM at Risk Delivery
      • 6. EDPA Lite with Any Delivery Method
      • 7. Master Architect Agreement for Design-Build Delivery
      • 8. Professional Services Agreement
    • Construction Contract Templates
      • 1. 179D/Inflation Reduction Act (IRA) Funding
      • 2. Best Value Contractor Selection
      • 3. Brief Design Build Contract Templates
      • 4. Brief Form Contract Templates
      • 5. CM at Risk Contract Templates
      • 6. Design Build Contract Templates
      • 7. Energy Savings Brief Design Build Contract Templates
      • 8. Informal Form Contract Templates
      • 9. Job Order Contracting (JOC) Contract Templates
      • 10. Long Form Contract Templates
      • 11. Mini Form Contract Templates
      • 12. Multiple Prime Contract Templates
      • 13. Prequalification
      • 14. Progressive Design Build Contract Templates
      • 15. Insurance and University Controlled Insurance Program (UCIP)
  • Resources
Log in

Design Contract Templates

Image credit: UC Santa Cruz Kresge College

Breadcrumb

  1. Home
  2. Design Contract Templates
  3. 3. Executive Design Professional Agreement (EDPA)
  4. 3l. Lump Sum Fee

Breadcrumb

  1. Home
  2. Design Contract Templates
  3. 3. Executive Design Professional Agreement (EDPA)
  4. 3l. Lump Sum Fee

3l. Lump Sum Fee

UCOP Facilities Manual

  • Manual
  • Design Contract Templates
  • Construction Contract Templates
  • Resources
  • Glossary
  • Help

Frequently Used Facilities Manual Links

  • Capital Programs
  • Capital Programs Institute
  • Capital Planning
  • Consolidated Capital Report
  • Capital Programs, Energy and Sustainability
  • Design and Construction Services
  • Facilities and Asset Management
  • Low Carbon Showcase
  • Small Business, Big Outcomes Program
  • UC Office of the President

Copyright © Regents of the University of California | University of California

  • Contacts
  • Accessibility
  • Privacy Statement
  • Terms of Use

Main navigation

  • Manual
    • Volume 1: University Administration
      • Chapter 1: Introduction to the Facilities Manual
        • 1.1 Facilities Manual Organization 
        • 1.2 Facilities Manual Content, Style, and Language 
          • 1.2.1 Content Levels
          • 1.2.2 Citation 
          • 1.2.3 References 
          • 1.2.4 Approved Documents
          • 1.2.5 Language
        • 1.3 Facilities Manual Revision, Maintenance, and Reproduction 
          • 1.3.1 Distribution
          • 1.3.2 Updates 
      • Chapter 2: Facilities Manual Executive Summary
      • Chapter 3: University Governance and Organization
        • 3.1 University Governance 
          • 3.1.1 The Regents
          • 3.1.2 The President
        • 3.2 University Facilities 
          • 3.2.1 Campuses
          • 3.2.2 Government Laboratory
          • 3.2.3 Division of Agriculture and Natural Resources
          • 3.2.4 Other Administrative Units
          • 3.2.5 Affiliated Units
        • 3.3 Preparation of Regents’ Materials 
      • Chapter 4: Delegations and Limitations of Authority
        • 4.1 Basic Authority
        • 4.2 Delegated Authority 
        • 4.3 Delegations of Authority Table 
      • Chapter 5: University Policies
        • 5.1 Text of Referenced Policies
      • Chapter 6: State Laws
        • 6.1 State Laws Applicable to University Construction Contracting 
      • Chapter 7: Project Quality Management Program
        • 7.1 Program Goals 
          • 7.1.1 Project Team Members
        • 7.2 Program Scope 
        • 7.3 Program Requirements and Procedures 
        • 7.4 Teamwork 
          • 7.4.1 Partnering
        • 7.5 Program Resources 
        • 7.6 Evaluation by the Project Team 
    • Volume 2: Planning
      • Introduction and Summary
      • Chapter 1: Academic and Strategic Planning
        • 1.1 Academic and Strategic Planning 
          • 1.1.1 Five-Year Planning Perspectives 
          • 1.1.2 Design and Planning Issues
      • Chapter 2: Long Range Development Plans
        • 2.1 LRDP
          • 2.1.1 LRDP Organization
          • 2.1.2 LRDP Elements
          • 2.1.3 Environmental Impact Report
          • 2.1.4 LRDP Approval and Amendment Process
      • Chapter 3: Physical Design Framework (PhDF)
        • 3.1 PhDF
          • 3.1.1 Typical Elements of a PHDF
          • 3.1.2 PhDF Approval and Amendment Process
      • Chapter 4: Capital Financial Plan
        • 4.1 CFP
          • 4.1.1 Typical Elements of a CFP
          • 4.1.2 CFP Approval and Amendment Process
      • Chapter 5: Environmental Issues and CEQA Compliance
        • 5.1 California Environmental Quality Act (CEQA) Compliance 
        • 5.2 Environmental Impact Classification Form 
        • 5.3 Environmental Health and Safety Liaison 
        • 5.4 Fire Marshal and Fire and Life Safety Issues 
      • Chapter 6: Pre-Design Phase
        • 6.1 Pre-Design
        • 6.2 Site Analysis
          • 6.2.1 Geotechnical Reports
          • 6.2.2 Hydrology Studies
          • 6.2.3 Land Surveys
        • 6.3 Existing Building Analysis
        • 6.4 Surveys of Existing Hazardous Materials (Due Diligence) 
        • 6.5 Data Compilation
          • 6.5.1 Site Analysis Report
          • 6.5.2 Site Analysis Drawings
          • 6.5.3 Comparative Site Analysis
        • 6.6 Programming
          • 6.6.1 Programming Objectives
          • 6.6.2 The Project Program
        • 6.7 Construction Costs
          • 6.7.1 Sources of Cost Information
          • 6.7.2 Methods of Estimating Costs
          • 6.7.3 Contingencies
          • 6.7.4 Preparing the Construction Cost Estimate
          • 6.7.5 Cost Indexing
          • 6.7.6 Donation Guidelines
      • Chapter 7: Capital Planning & Real Estate Approvals
        • 7.1 Capital Project Budget Approvals 
        • 7.2 Capital Project Design Approvals 
        • 7.3 Capital Project Budget Augmentations and Scope Changes 
          •  7.3.1 Authority and Transaction Requirements
          • 7.3.2 Scope Changes and Implementing Work Changes
        • 7.4 Guidelines for Minor Amendments to PhDF 
          • 7.4.1 Amendments
          • 7.4.2 Process for Approval of Changes
          • 7.4.3 PhDFs are not "Projects" as Defined by CEQA
        • 7.5 Certification Checklist Directions 
          • 7.5.1 Certification Checklist Eligibility
          • 7.5.2 Submittal Requirements
          • 7.5.3 Process
          • 7.5.4 General Order of Actions for the Delegated Process
        • 7.6 Reporting for Capital Projects 
          • 7.6.1 Requirements
        • 7.7 Authorization for Acquisitions, Dispositions, or Ground Lease of Real Property 
        • 7.8 Requirements to Lease, License, and Granting Easements or Rights-of-Way Under Delegated Authority  
          • 7.8.1 Leases
          • 7.8.2 Licenses
          • 7.8.3 Easements and Rights-of-Way
          • 7.8.3 Ancillary Documents, Amendments, and Other Modifications
          • 7.8.4 Reporting Requirements
          • 7.8.5 Forms 
          • 7.8.6 Process for Legal Review
          • 7.8.7 Descriptions of Lease, License, and Easement
          • 7.8.8 Further Delegation of Authority
        • 7.9 Reimbursement Agreements and Stipend Agreements Ancillary to Real Property Transactions 
          • 7.9.1 Authority
          • 7.9.2 Description of Reimbursement and Stipend Agreements
    • Volume 3: Design, Design Documents, Instruction, Models
      • Chapter 1: Project Design Phases
        • 1.1 Predesign Phases 
          • 1.1.1 Design Professional Services
          • 1.1.2 Project Program
          • 1.1.3 Review of Conceptual Design
          • 1.1.4 Preliminary Evaluation
        • 1.2 Schematic Design 
          • 1.2.1 Environmental Documents
          • 1.2.2 Value Engineering
        • 1.3 Design Development 
          • 1.3.1 Value Engineering
          • 1.3.2 Design Development Documents and the Effective Code Date
        • 1.4 Construction Documents 
      • Chapter 2: Consultant Selection
        • 2.1 University Guidelines of Equal Opportunity in Contracting 
        • 2.2 Procedures for Consultant Selection
          • 2.2.1 Advertising
          • 2.2.2 Applicant Pool
          • 2.2.3 Screening Committee 
          • 2.2.4 Screening Process
          • 2.2.5 Selection Committee
          • 2.2.6 Selection Process
          • 2.2.7 Conflict of Interest
          • 2.2.8 Avoiding Follow-On Contracts
          • 2.2.9 Sheltered SBE/DVBE Pool For Executive Design Professionals Under $100,000
        • 2.3 Contract Negotiations and Appointments 
        • 2.4 Consultant Insurance Requirements  
        • 2.5 Agreement Execution 
        • 2.6 Project File Records 
        • 2.7 Consultant Services Not Covered by PCC 10510.4 - 10510.9
        • 2.8 Design Professional Appointment Procedures 
        • 2.9 Authority to Appoint Executive Design Professionals 
        • 2.10 Submitting a Request for an Executive Design Professional Appointment 
      • Chapter 3: Design Professional Agreements
        • 3.1 Preapproved Agreements 
        • 3.2 Modifying Pre-Approved Agreements 
        • 3.3 Cover Sheets and Instructions 
        • 3.4 General Preparation Instructions 
        • 3.5 Executive Design Professional Agreement
          • 3.5.1 Terms in the Executive Design Professional Agreement
        • 3.6 Management Agreement 
        • 3.7 Professional Services Agreement 
      • Chapter 4: Code and Regulatory Compliance
        • 4.1 Code Compliance and Administration 
          • 4.1.1 Certified Building Official (CBO)
          • 4.1.2 Designated Campus Fire Marshal (DCFM)
          • 4.1.4 Occupancy and Ancillary Documents
        • 4.2 State Codes, Regulations, and Agencies 
          • 4.2.1 Effective Code Date
          • 4.2.2 California Code of Regulations
          • 4.2.3 California Building Code
          • 4.2.4 California Energy Code
          • 4.2.5 Energy Code Updates – Solar and Storage Requirements for New Buildings
          • 4.2.6 Division of State Architect, Access Compliance
          • 4.2.7 Department of Health Care Access and Information (HCAI)
          • 4.2.8 California Coastal Commission
          • 4.2.9 Division of Industrial Safety and Health, Elevator Unit
          • 4.2.10 Department of General Services
        • 4.3 Local Jurisdictions 
          • 4.3.1 Air Quality Management Districts
          • 4.3.2 Storm Water Programs
        • 4.4 Federal Regulations 
          • 4.4.1 Americans with Disabilities Act
          • 4.4.2 Clean Air Act
          • 4.4.3 Clean Water Act
          • 4.4.4 Hazardous Waste Laws
      • Chapter 5: Design Reviews and Approval
        • 5.1 Independent Design and Cost Review 
          • 5.1.1 Independent Reviewer Selection
          • 5.1.2 Design Review Format
          • 5.1.3 Cost Review Requirements
        • 5.2 Environmental Review and Documentation 
        • 5.3 Seismic Safety and Review
          • 5.3.1 Seismic Safety Policy
          • 5.3.2 Seismic Safety Program
        • 5.4 Site Approval 
        • 5.5 Design Approval Authority 
        • 5.6 Regents’ Design Approval 
          • 5.6.1 Guidelines for Preparing and Submitting Regents' Action Items
          • 5.6.2 Environmental Documentation
          • 5.6.3 Procedures for Submitting Environmental Documents
        • 5.7 UCOP and Regents’ Presentation 
          • 5.7.1 Preparation
          • 5.7.2 UCOP Design Review Meeting
          • 5.7.3 Meeting of the Regents' Finance and Capital Strategies Committee
        • 5.8 Executive Vice President Design Approval 
          • 5.8.1 Guidelines for Preparing and Submitting Presidential Action Items
          • 5.8.2 Environmental Documentation
        • 5.9 UC Sustainability Requirements 
          • 5.9.1 Policy on Sustainable Practices
      • Chapter 6: Project Records
        • 6.1 Record Retention
          • 6.1.1 Project File Contents
    • Volume 4: Construction Contracting
      • Chapter 1: Construction Contracting
        • 1.1 Required Modes of Contracting 
          • 1.1.1 Complete Plans and Specifications Contracting Mode
          • 1.1.2 Design Build Mode
          • 1.1.3 Construction Manager Mode
          • 1.1.4 Cost-Plus-Fee Mode
          • 1.1.5 Other Contracting Modes
        • 1.2 Types of Construction Contracts 
          • 1.2.1 The Single Contract and Multiple Prime Contracts
        • 1.3 Types of Construction Documents 
          • 1.3.1 Long Form
          • 1.3.2 Brief Form
          • 1.3.3 Informal Form
          • 1.3.4 Mini Form
          • 1.3.5 Design-Build Form
          • 1.3.6 Progressive Design-Build Form
          • 1.3.7 CM at Risk Form
          • 1.3.8 Multiple Prime Form
          • 1.3.9 Job Order Contract (JOC)
          • 1.3.10 Brief Design-Build
        • 1.4 Construction Team 
          • 1.4.1 University
          • 1.4.2 Contractor
          • 1.4.3 University's Representative
          • 1.4.4 Design Professional
          • 1.4.5 Construction Manager
          • 1.4.6 Project Manager
        • 1.5 Methods of Determining, Stating, and Paying the Contract Sum 
          • 1.5.1 Lump Sum Method
          • 1.5.2 Cost-Plus-Fee Method
          • 1.5.3 Unit Prices Method
      • Chapter 2: Construction Document Organization
        • 2.1 Construction Document Format
        • 2.2 Core Documents and Non-Core Documents 
        • 2.3 Contract Documents 
      • Chapter 3: Selecting the Type of Construction Documents
        • 3.1 Estimated Contract Sum
          • 3.1.1 General Dollar Limitations
          • 3.1.2 Lowest Informal Bid Exceeds $640,000
          • 3.1.3 Federally Funded Projects
          • 3.1.4 Equipment Purchase and Installation
        • 3.2 Contractor Selection 
      • Chapter 4: Preparing Individual Construction Documents
        • 4.1 Cover Sheets and Instructions
        • 4.2 General Preparation Instructions 
          • 4.2.1 Digital Signatures and Notarization
        • 4.3 Introductory Pages 
          • 4.3.1 Cover Page
          • 4.3.2 Certification
          • 4.3.3 Table of Contents
        • 4.4 Bid Solicitation 
          • 4.4.1 Request for Bid
          • 4.4.2 Advertisement for Bids
          • 4.4.3 Project Directory
        • 4.5 Bidding Requirements
          • 4.5.1 Instructions to Bidders
          • 4.5.2 Supplementary Instructions to Bidders
          • 4.5.3 Information Available to Bidders
          • 4.5.4 Bid Form
          • 4.5.5 Bid Bond
        • 4.6 Contract Documents
          • 4.6.1 Agreement
          • 4.6.2 General Conditions
          • 4.6.3 Supplementary Conditions
          • 4.6.4 Exhibits
          • 4.6.5 Specifications
          • 4.6.6 List of Drawings
          • 4.6.7 Drawings
          • 4.6.8 Addenda
          • 4.6.9 Notice to Proceed
          • 4.6.10 Change Order
          • 4.6.11 Field Order
          • 4.6.12 Notice of Completion
      • Chapter 5: Modifying the Construction Documents
        • 5.1 Updates to the Construction Documents 
          • 5.1.1 Interim Improvements Made by Letter
        • 5.2 Document Changes Related to Contracting Mode 
          • 5.2.1 Using Complete Plans and Specifications Mode
          • 5.2.2 Modifications for the Design-and-Build Mode
          • 5.2.3 Modifications for the Construction Manager Mode
          • 5.2.4 Modifications for the Cost-Plus-Fee Mode
          • 5.2.5 Modifications for Other Contracting Modes
        • 5.3 Special Project Applications 
          • 5.3.1 Federally Funded Projects
        • 5.4 Special Project Circumstances 
          • 5.4.1 Allowances
          • 5.4.2 Alternates
          • 5.4.3 Asbestos Abatement
          • 5.4.4 Assignments
          • 5.4.5 Bidder Prequalification
          • 5.4.6 Bidder Qualification
          • 5.4.7 Code Requirements, Optional
          • 5.4.8 Early Completion Bonus
          • 5.4.9 Construction Sequence
          • 5.4.10 Contractor's Statement of Experience and Financial Condition
          • 5.4.11 Hospital Projects
          • 5.4.12 Incremental Funding of Single Lump-Sum Contracts
          • 5.4.13 Irrevocable Bid Period, Changing
          • 5.4.14 Daily Rate of Compensation for Compensable Delays
          • 5.4.15 Phased Construction and Multiple Liquidated Damages
          • 5.4.16 Separate Bids and Combined Bids
          • 5.4.17 Separate Contracts
          • 5.4.18 Soil and Subsurface Conditions
          • 5.4.19 Soils Engineer
          • 5.4.20 Specialty Contractors
          • 5.4.21 Trenching and Excavating
          • 5.4.22 Unit Prices
          • 5.4.23 University Controlled Insurance Program (UCIP)
          • 5.4.24 Use of Common Site
          • 5.4.25 Volunteer Labor
      • Chapter 6: Construction Documents Review Procedures
        • 6.1 University Reviews
          • 6.1.1 Facility Reviews
          • 6.1.2 UCOP and UCL
        • 6.2 External Reviews
          • 6.2.1 Division of the State Architect - Access Compliance
          • 6.2.2 Office of the State Fire Marshal
          • 6.2.3 Department of Health Care Access and Information (HCAI)
          • 6.2.4 Coastal Commission
          • 6.2.5 Air Quality Management Districts
          • 6.2.6 Federal Agencies
      • Chapter 7: Project Quality Management Program
        • 7.1 Program Goals
          • 7.1.1 Project Team Members
        • 7.2 Program Scope
        • 7.3 Program Requirements and Procedures 
        • 7.4 Teamwork 
          • 7.4.1 Partnering
        • 7.5 Program Resources 
        • 7.6 Evaluation by the Project Team 
    • Volume 5: Bidding and Construction Administration
      • Chapter 1: Methods of Contractor Selection
        • 1.1 Competitive Bidding
          • 1.1.1 Formal vs. Informal Competitive Bidding
          • 1.1.2 Federally Funded Projects
        • 1.2 Informal Competitive Bidding Procedures 
          • 1.2.1 Sheltered SBE/DVBE Informal and Negotiated Bidding Pool 
        • 1.3 Negotiated Contracting 
        • 1.4 Duration of the Bidding Period 
        • 1.5 Equal Opportunity Policy 
          • 1.5.1 Outreach
          • 1.5.2 Certification
          • 1.5.3 Statistical Records
        • 1.6 Best Value Contractor Selection 
          • 1.6.1 Best Value Bidder Selection Process
          • 1.6.2 Required Guidelines for Evaluation of Bidder Qualifications
          • 1.6.3 Procedures for Evaluation of Bidder Qualifications  
      • Chapter 2: Bidding Documents
        • 2.1 Bidding Document Types
        • 2.2 Bidding Document Review
      • Chapter 3: Preparing to Solicit Bids
        • 3.1 Conditions Prerequisite to Bidding 
        • 3.2 Availability of Funds 
          • 3.2.1 State-Funded Projects
          • 3.2.2 Non-State-Funded Projects
        • 3.3 Concurrent Approval by Funding Agency
          • 3.3.1 State-Funded Projects
          • 3.3.2 Lease-Revenue Bond-Funded Projects
        • 3.4 Project File Maintenance 
        • 3.5 Compliance with State and Federal Law or Regulation 
          • 3.5.1 American Recovery and Reinvestment Act of 2009 (ARRA)
          • 3.5.2 Prevailing Wage Determination Date
      • Chapter 4: Determining Bidder Responsibility
        • 4.1 Responsibility: Origin and Policy 
        • 4.2 Standard Bidding Document Requirements 
        • 4.3 Prequalification
          • 4.3.1 Prequalification Guidelines
          • 4.3.2 Contractor Prequalification Procedures
          • 4.3.3 Subcontractor Prequalification Procedures
        • 4.4 Qualification 
          • 4.4.1 Qualification Guidelines
          • 4.4.2 Qualification Procedures
        • 4.5 Disqualification
          • 4.5.1 Disqualification Guidelines
          • 4.5.2 Disqualification Procedures
      • Chapter 5: Soliciting Bids
        • 5.1 Soliciting Formal Competitive Bids 
          • 5.1.1 Advertising for Bids
          • 5.1.2 Issuing Bidding Documents
          • 5.1.3 Pre-Bid Conference
          • 5.1.4 Modification or Withdrawal of Bids Before the Bid Deadline
          • 5.1.5 Establishment of Procedure for Selection of Alternates
        • 5.2 Soliciting Informal Competitive Bids 
          • 5.2.1 Withdrawal of Bids Before the Bid Deadline
        • 5.3 Addenda 
      • Chapter 6: Receiving and Opening Bids
        • 6.1 Bid Deadline 
        • 6.2 Receiving Formal Competitive Bids 
          • 6.2.1 Bid Submittal Requirements
          • 6.2.2 Facility Procedures
          • 6.2.3 Modification or Withdrawal of Bids After the Bid Deadline
        • 6.3 Opening Formal Competitive Bids
          • 6.3.1 Facility Procedures
        • 6.4 Receiving Informal Competitive Bids 
          • 6.4.1 Bid Submittal Requirements
          • 6.4.2 Facility Procedures
          • 6.4.3 Withdrawal of Bids After the Bid Deadline
        • 6.5 Opening Informal Competitive Bids 
          • 6.5.1 Facility Procedures
      • Chapter 7: Reviewing and Evaluating Bids
        • 7.1 Responsive and Nonresponsive Bids 
          • 7.1.1 Bid Irregularities
        • 7.2 Bid Protests
        • 7.3 Evaluating Bids 
          • 7.3.1 Preparing the Bid Summary
          • 7.3.2 Alternates
          • 7.3.3 Separate Bids and Combined Bids
        • 7.4 Determining the Lowest Responsible Bidder
        • 7.5 Rejection of All Bids 
      • Chapter 8: Executing and Awarding the Contract
        • 8.1 Conditions Prerequisite to Contract Execution and Award 
        • 8.2 Concurrent Approval of Award by Funding Agency 
          • 8.2.1 State-Funded Projects
          • 8.2.2 Projects Under Department of Energy Contracts
          • 8.2.3 Federally or Non-State-Funded Projects
        • 8.3 Funding of Related Construction or Equipment 
        • 8.4 Notifying the Lowest Responsible Bidder
          • 8.4.1 Forfeiture of Bid Bond
        • 8.5 Required Bidder Submittals 
          • 8.5.1 Performance and Payment Bonds
          • 8.5.2 Certificates of Insurance
          • 8.5.3 Contractor's Statement of Experience and Financial Condition
        • 8.6 Executing the Contract 
          • 8.6.1 Corporate Seal and Attest
          • 8.6.2 Digital Signatures
        • 8.7 Awarding the Contract 
          • 8.7.1 Document Maintenance Upon Award
          • 8.7.2 Custody of Construction Documents
          • 8.7.3 Reporting the Award to UCOP
        • 8.8 Early Start of Construction 
        • 8.9 Notice to Proceed 
        • 8.10 Recording the Contract Documents 
      • Chapter 9: Bid Protests
        • 9.1 Bid Protests 
        • 9.1.1 Filing a Bid Protest
        • 9.1.2 Facility Review of the Protest
        • 9.1.3 Construction Review Board Appeal
      • Chapter 10: Contractor Substitution During the Bidding Period
        • 10.1 Substitution of Subcontractors During the Bidding Period 
          • 10.1.1 Procedures Applicable to Substitution for Clerical Error
          • 10.1.2 Consent Does Not Change the Contract
      • Chapter 11: Contract Administration
        • 11.1 Contract Administration Responsibility and Policy
          • 11.1.1 The University and the University's Representative
          • 11.1.2 Facility Responsibilities
          • 11.1.3 Keeping a Project File
          • 11.1.4 Administration of Projects Funded by Federal Grants
        • 11.2 Preconstruction Conference (Kick-Off)
        • 11.3 Submittals
          • 11.3.1 Schedules
          • 11.3.2 Shop Drawings
          • 11.3.3 Product Data and Samples
          • 11.3.4 Test Reports
          • 11.3.5 Requests for Substitution of Materials and Equipment
          • 11.3.6 Buy Clean California (BCCA) Submittal Requirements: Environmental Product Declarations (EPDs) and Product Category Rules (PCRs)
        • 11.4 Assignments
        • 11.5 Substitution of Subcontractors After Contract Award
          • 11.5.1 Authorized Grounds for Consenting to a Contractor's Request for Substitution
          • 11.5.2 Procedures for Substitution Requests on Grounds Other Than a Clerical Error
          • 11.5.3 Consent Does Not Change the Contract
          • 11.5.4 Failure to Specify a Subcontractor
          • 11.5.5 Penalty for Violating Fair Practices Act Provisions
        • 11.6 Insurance and Bonds
          • 11.6.1 Payment Bond
          • 11.6.2 Performance Bond
          • 11.6.3 Liability Insurance
          • 11.6.4 Builder's Risk Insurance and Loss Reporting
      • Chapter 12: Field Administration
        • 12.1 Field Observation 
        • 12.2 Inspection Policy and Responsibility
          • Pros and Cons of Inspection Responsibility Combinations
          • 12.2.1 Allocating Inspection Responsibility
          • 12.2.2 Basic Inspection Staff
          • 12.2.3 Geotechnical Engineering and Inspection
          • 12.2.4 Hospital Safety Standards and Inspection
        • 12.3 Testing
        • 12.4 Surveying
        • 12.5 Project Progress Meetings
        • 12.6 Responsibility for Safety
      • Chapter 13: Contract Modifications
        • 13.1 Field Orders
          • 13.1.1 Payment for Work Directed by a Field Order
        • 13.2 Change Orders 
          • 13.2.1 Cost Proposals
          • 13.2.2 Change Order Execution
          • 13.2.3 Change Orders and the Notice of Completion
          • 13.2.4 Contractor Disapproval of Change Orders
          • 13.2.5 Substantial Changes to the Work After Contract Award
          • 13.2.6 Guidelines for Substantial Change Orders
          • 13.2.7 Change Orders Changing the Scope of Work
          • 13.2.8 Change Orders for Post-Award Alternates
          • 13.2.9 Authority Needed to Negotiate and Execute Change Orders
          • 13.2.10 Project Contingency Use
        • 13.3 Modification of Contractual Conditions 
        • 13.4 Time Extensions Resulting From Delays 
          • 13.4.1 Guidelines For Granting Time Extensions Resulting from Delays
        • 13.5 Time Extensions Resulting from Factors Other Than Delays 
      • Chapter 14: Project Monitoring
        • 14.1 Monitoring the Contract Schedule 
        • 14.2 Wage Guidelines and Statutory Requirements 
          • 14.2.1 Prevailing Wage Rates and Fair Wage
          • 14.2.2 Payroll Records
          • 14.2.3 Employment of Apprentices
        • 14.3 Hospital Requirements
          • 14.3.1 HCAI Requirements
          • 14.3.2 Special Additional Hospital Requirements
        • 14.4 Risk Monitoring
      • Chapter 15: Contractor Payments
        • 15.1 Cost Breakdown
        • 15.2 Progress Payments
        • 15.3 Application for Payment
        • 15.4 Certificate for Payment
        • 15.5 Retention
          • 15.5.1 Normal Retention
          • 15.5.2 Securities In Lieu of Retention and Deposit of Retention Into Escrow
          • 15.5.3 Release of Retention
        • 15.6 Liquidated Damages
      • Chapter 16: Claims Resolution
        • 16.1 Contractor Claims
        • 16.2 Conditions for Making a Claim 
          • 16.2.1 Change Order Requests
        • 16.3 Negotiation 
          • 16.3.1 Decision on Claims
        • 16.4 Mediation
        • 16.5 Litigation
      • Chapter 17: Beneficial Occupancy and Substantial Completion
        • 17.1 Taking Beneficial Occupancy
        • 17.2 Determining Substantial Completion 
        • 17.3 Ending Builder’s Risk Insurance
        • 17.4 Reducing Liquidated Damages After Substantial Completion
      • Chapter 18: Contract Closeout
        • 18.1 As-Built and Record Documents 
        • 18.2 Operating and Maintenance Data 
        • 18.3 Guarantees 
          • 18.3.1 Special Guarantees
        • 18.4 Final Completion 
        • 18.5 Notice of Completion
        • 18.6 Final Payment and Release of Retention
        • 18.7 Stop Payment Notices
      • Chapter 19: Project Closeout
        • 19.1 Final Budget
        • 19.2 Closeout of Projects Funded by Federal Grants
        • 19.3 Correction of Defective Work 
          • 19.3.1 Patent and Latent Defects
          • 19.3.2 Reporting Defects and Deficiencies
          • 19.3.3 Personal Injury Caused by Inadequate Design or Poor Construction
          • 19.3.4 Post Construction Meeting
      • Chapter 20: Project Quality Management Program
        • 20.1 Program Goals 
          • 20.1.1 Project Team Members
        • 20.2 Program Scope 
        • 20.3 Program Requirements and Procedures
        • 20.4 Teamwork 
          • 20.4.1 Partnering
        • 20.5 Program Resources 
        • 20.6 Evaluation by the Project Team 
    • Volume 6: Plant Operations and Maintenance
      • Chapter 1: Plant Operations and Maintenance
        • 1.1 OMP Program Goals 
          • 1.1.1 Environmental Health and Safety References
          • 1.1.2 Health Care Accreditation Requirements
        • 1.2 Operation
          • 1.2.1 Services
        • 1.3 Construction
        • 1.4 Project 
        • 1.5 Infrastructure
        • 1.6 Maintenance
        • 1.7 Types of Maintenance
          • 1.7.1 Predictive or Planned Maintenance
          • 1.7.2 Preventive Maintenance
          • 1.7.3 Unplanned or Reactive Maintenance
          • 1.7.4 Emergency Maintenance
        • 1.8 Repair
        • 1.9 Emergency Repair
        • 1.10 Exceptions to Competitive Bidding
          • 1.10.1 Specialized Equipment
          • 1.10.2 Projects under $50,000
        • 1.11 Design Services
      • Chapter 2: Restoration and Renewal Program
        • 2.1 Facility Audit and Inspection Program
          • 2.1.1 Facility Inspection and Project Identification
          • 2.1.2 Prioritization
          • 2.1.3 Further Project Categorization
          • 2.1.4 Restoration or Capital Renewal Projects
          • 2.1.5 Integrated capital asset management program (ICAMP)
          • 2.1.6   Data Governance 
          • 2.1.7 Corporate Equipment, Facilities, and Assets System (EFA)
        • 2.2 Restoration and Renewal Funding Sources 
          • 2.2.1 State Funds
          • 2.2.2 Non-State Funds
        • 2.3 Restoration and Renewal Lists 
        • 2.4 Reports of Defects and Deficiencies 
          • 2.4.1 Guidelines for Reporting Defects and Deficiencies
          • 2.4.2 Preventing Building Deficiencies
      • Chapter 3: Energy and Water Conservation and Management
        • 3.1 Sustainability Conservation Standards and Guidelines 
          • 3.1.1 Operational Guidelines
        • 3.2 Alternate Fuel Provision
          • 3.2.1 Campus Contingency Planning
          • 3.2.2  Hospital Facilities Requirements
        • 3.3 Utility Regulatory Agencies 
          • 3.3.1 California Public Utilities Commission (CPUC)
          • 3.3.2 OMP Workload Categories
      • Chapter 4: Plant Administration
        • 4.1 Emergency Management Program
        • 4.2 Standardized Emergency Management System (SEMS) 
        • 4.3 Facility Mutual Assistance
        • 4.4 Post-Earthquake Response
        • 4.5 Emergency Preparedness and Evacuation Checklist
  • Glossary
  • Templates
    • Design Contract Templates
      • 1. Balcony Bill PSA
      • 2. Construction Management Agreement
      • 3. Executive Design Professional Agreement (EDPA)
      • 4. EDPA Blanket Agreement
      • 5. EDPA for CM at Risk Delivery
      • 6. EDPA Lite with Any Delivery Method
      • 7. Master Architect Agreement for Design-Build Delivery
      • 8. Professional Services Agreement
    • Construction Contract Templates
      • 1. 179D/Inflation Reduction Act (IRA) Funding
      • 2. Best Value Contractor Selection
      • 3. Brief Design Build Contract Templates
      • 4. Brief Form Contract Templates
      • 5. CM at Risk Contract Templates
      • 6. Design Build Contract Templates
      • 7. Energy Savings Brief Design Build Contract Templates
      • 8. Informal Form Contract Templates
      • 9. Job Order Contracting (JOC) Contract Templates
      • 10. Long Form Contract Templates
      • 11. Mini Form Contract Templates
      • 12. Multiple Prime Contract Templates
      • 13. Prequalification
      • 14. Progressive Design Build Contract Templates
      • 15. Insurance and University Controlled Insurance Program (UCIP)
  • Resources